Answer Posted / vijayaraj24
framed structure ,stub structure,super structure,
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
what are the duties of Site Engineer in work site?
how lap length is increased with increase of Grade of steel?
what course did you consider thinking before you enrolled in college?
What is the Maximum %age of Steel in columns and beams ?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
What does civil status mean?
density of crush sand & crush stone or grit powder
what is the difference between tsp & tower
How is the leaning tower of pisa supported?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.