Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the dedicated neutral earth in ups? y its required?

Answer Posted / srinivas murthy

Deticated earthings means - seperate earth for arresting of
leakage from load side & avoiding flot voltage respect P-
N , P-E

Is This Answer Correct ?    4 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in what type of applications v can use q meter?

2072


dear all i am kumara now current working in electrical designing of control and relay panel i want learn some substaion design then any book are available. pls mention name and authour

1898


why should the lowest unit of a testing transformer ( cascaded transformer ) have higher power rating??

2249


No load tap changing transformer working

1587


how many types control panel of a 132/33 kv substation

2598


What is the use of bundle conductors?

1104


I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?

1892


Zone of protection and tripping scheme of arc protection relay.

1818


what are all the components required to assemble solar panel other than pv cell?

1439


1hp= how much rpm

2020


Is the installation of the filter cloths necessary before spreading the gravels at the transformer yards?

1896


What is time response of the control system?

1038


the problem faced on star or delta winding connection??

1873


What should be the percentage increase in length of the dead end clamp for bus bar conductor (Hawthorn) after hydraulic pressing and what should be the applied pressure?

1889


why tertiary winding is used in transformer with diagram?

2203