Answer Posted / er. harpal singh
Sand fails due to shear failure.... and sand failure is also
depends on angle of friction..... Or many reasons such as if
water table is high, due to not proper compaction etc
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What things you need to take care of before building a kitchen island?
Why you are leaving present job?
During reclamation how can the occurrence of mud waves can be rectified?
Define What does civil status mean?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is the Hardness of M-40 grade concrete, general and theoratical
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
what else we can add rather than admixture in concrete to reduce the cement quantity?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
how to calibrate the RM 800
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
List out some of the checking’s, done at the completion of construction?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
The definition of national highway