break down of electricity is more in summer or in winter ?
give reason
Answer Posted / ks chiranjeevi
Due to heat, the transformers will get heated up and the
inside oil viscosity will become lesser and the transformer
primary and secondary coils will be short circuited.
Due to less water availability, the Hydroelectricity will
becomes less leads to shortage of power.'
Due to heat in summer, the turbine connected alternators
will become prone to more heat compare to normal heat in
other seasons, the unit trips.
Due to heat in atmosphere, the people draws more power
through water coolers, air conditioners, etc., and shortage
in power causes power breakdowns.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what are the necessary basic electrical topics to learn for mechanical engineer to deal practical problems.
Why negative feedback is preferred in the control system?
Hoe do calculate the Cable size for Amps rating ?
What is effect of harmonic current (Draw by VFD) on power system/ electrical Equipments ?
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
why the value of k is more in shell typr transformers?
What are the different types of dams?
What is the mmf,rgt and ngt please brief completely
how to carry out Magnetizing Current Test on Distribution transformer and what purpose we are doing this test. why transformer rating in always in KVA ? what ispositive, negative, zero sequence impedence? How ElCB tripping if Neutral touch with ground Why AC & DC capacitor are use in UPS ? why motor rating in KW? how to syncronize two dg sets
How to calculate VA rating for CT or PT or Control Transformer?
Sir, I have applied for the of Assistant.engineer of NPDCL. please send me all AP TRANSCO AND JENCO solved papers of previous exams . I requested send me the papers to my id as soon as possible (rajanikanth_peddi@yahoo.co.in) (This is very urgent) Thank You,
Load transfer in 11kv double busbar switchgear - operation.
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron
one split ac how can told of this ac which Tr tell me us