1)What is the maximum size of aggregate that can be used
for M-50 grade concrete ? Code teh authority?

Answer Posted / rabla

10mm aggergate

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

1818


how gradation of aggregates effect on slump of fresh concrete?

1835


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1507


Define absolute co-ordinates?

755


Difference between lime, distemper and plastic emulsion?

1239






What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

1854


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1952


04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1

1589


What is the outturn of Ceiling plastering

2863


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2059


How can we demolish concrete beams?

1776


How much is the cover for slab?

740


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4468


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4162


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

1711