Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

can any tell me how to do wiring connection in L&T 3ph 4wire
E301 CT operated energy meter, what is P1,P2,P3,P0.
M1,M2,M3, L1,L2,L3.

Answer Posted / k.prakashchandra

In other words P1-P0,P2-P0 and P3-P0 are for potential
coils.M1-L1,M2-L2 and M3-L3 are for current coils.

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

dear all i am kumara now current working in electrical designing of control and relay panel i want learn some substaion design then any book are available. pls mention name and authour

1945


Does the motor power displayed on the Motor name plate is the mechnical power motor delivers or it is consumed power from the system?

4384


How to design the earth grid for lightning protection in an industry

4653


A cylindrical wire is compressed in length by 10%. The percentage decrease in the resistance will be?????

2257


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

2266


Why 1/3 is used in symmetrical components?

1838


how can get electrical "c" licence.i am complited in DEEE.PASSING YEAR OF 1993.WORKING IN PVT COCERN LT LINE.PLEASE ADVISE ME .CELL NO 9994786021

1947


what is the relationship between phase & neutral

2581


1)we have 1000 cfm Blower,Dia-1Mtr,Velocity of air 94 m/s 2)We have Natural Air velocity 94m/s 3If i Put Wind Mill in natural air ,speed is 94m/s Then it will generate Assume 100kw 4)If i put same wind mill across the Blower,air speed is same 94m/s now the Question is Will it generate 100 kw?

1992


The size and construction of bushings in a transformer depend upon?

1761


how can tell us the AC indoor or outdoor which Tr and formulls

1761


excitation limit of an excitor

2044


How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer

1745


thyristor controlled APFC panel design parameter?

1777


which book to refer in electrical engineering for iocl exam & which book for general english.

2236