what is the difference between NP2 Class and NP3 Class RCC
Hume pipes
Answer Posted / modipraveen
Those are Non Pressure 2 and Non Pressure 3
| Is This Answer Correct ? | 11 Yes | 12 No |
Post New Answer View All Answers
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
how to compute slab reinforcements on step by step procedures??
What is the use of extruded feature in solidsworks?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
Describe a time when you anticipated potential problems and developed Preventive measures
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
how to calculate the weight of concrete
When column of building is abutting the boundary line,then suitable footing advised is
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how many cement used in single story residential building per sqft
important question on stones
Moisture content calculation for diff mix ratio's ??