1,If there are 3 workflows are running and if 1st workflow
fails then how could we start 2nd workflow or if 2nd
workflow fails how could we start 3rd workflow?
Answer Posted / dharmendra singh
two ways to do this 1: Use worklet for each workflow and
create and workflow with these worklets and create
dependency. 2: Use a scheduling tools such as control M or
Autosys JIL to create dependency among workflows.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How to load the name of the current processing flat file along with the data into the target using informatica mapping?
What is an aggregator transformation?
How to Create a folder using pmrep command?
What is the difference between stop and abort in informatica
What are the tasks that can be performed using sq?
How you know when to use a static cache and dynamic cache in lookup transformation?
If informatica has its scheduler why using third party scheduler?
What is the status code in stored procedure transformation?
Explain informatica architecture - version 8 / 9
Write the prerequisite tasks to achieve the session partition?
Explain the pipeline partition with real time example?
What are the informatica performance improvement tips
What is a code page?
Global and Local shortcuts. Advantages.
What is meant by active and passive transformation?