Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Where double earthing is required? Is there any power
specification to have double earthing?

Answer Posted / k.prakashchandra

I think that IE rules insist on 'two distinct earth connections'

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.

1993


hr round

2066


Star Delta Diagram with full description

2331


how to differentiate a mpcb,mcb with a contactor? Explain their working operation

2129


How to Design green buildings services? What is the advantage to design green building?

1743


what is the AC Plant and how can do the work with parts and picture tell us 150 Tr

1971


hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.

1946


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2767


what is the purpose of high speed earth switch in gas insulated substat

2930


How can get elongation of 2 k.G aluminium, if elongated aluminium dia is 2.5 mm?

2246


what is stper motor

2358


why can the rotor of 3 phase slip ring induction motor not be a 2 phase rotor?

2001


In 90 kva alternator that produce the output voltage is 115(p-n),200(p-p) at 1500 rpms means what ampere it produced ?

1980


how can you size an automatic voltage regulator?

2294


Why did lightening arrestor solid copper rod head is sharp on mobile tower top?

1951