how to calculate length of bar

Answer Posted / er,arvind

8mm dia

22/7*4*d*d*78.5=wight/meter

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is castigliano theaorem

1840


What is the Hardness of M-40 grade concrete, general and theoratical

1671


why we are useing plastic under the lean concrete?and whts the advantage?

2169


Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

1960


1m square 20mm plastering how much of water need curing work

1473






What is the worlds largest concrete dam?

721


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1014


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2154


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2037


Define What is rigging?

642


Permissible wastage of cement as per IS code ? In which IS code I get it?

1225


whaat is blister in box girder bridge and what is its function..

4393


Which brick is best for construction ,either fly ash or AAC BLOCKS

590


what r you reqired for concrete baching plant?

1915


we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?

1922