Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step

Answer Posted / arunothayan umakanthan

bricks 500 nos
cement 1.88 bags
sand .266 cum

Is This Answer Correct ?    297 Yes 107 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent

2193


What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete

7146


How to do base isolation for RC framed structure using ETABS software?

4166


Define different types of roof systems?

1173


define the strength

2150


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

2029


what's the formula for calculate pcc for matt(45mm aggregate)?

2693


For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

1857


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1611


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

1101


Formula for calculation volume of essentric footing

1794


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

2100


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

2287


how find the cut length of tringular ring and any formula find out the quantity of circular brick work

6377


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

2374