How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / arunothayan umakanthan
bricks 500 nos
cement 1.88 bags
sand .266 cum
| Is This Answer Correct ? | 297 Yes | 107 No |
Post New Answer View All Answers
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
How to do base isolation for RC framed structure using ETABS software?
Define different types of roof systems?
define the strength
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
what's the formula for calculate pcc for matt(45mm aggregate)?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
Formula for calculation volume of essentric footing
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––