Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do you calculate of power factor, if it is lagging or
leading for unit(1).

Answer Posted / vishal ingle

we can calculate power factor using formula
P = SQRT(3)* V * I * COS(PHAI)
but for deciding whether leading or lagging p.f we need
complex power
i.e. KVA = KW + j*KVAR or KVA = KW - j*KVAR

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can calculate the earthing strip of Copper/GI for rating of 30kV,discharge current 10KA Lightning arrester.

2326


Why 3 phase induction motor getting supply in body if one of it's phase is cut

1741


i m in need of current rating chart of heavy duty pvc/xlpe, cu/al cables. can somebody provide me? if yes, plz send me at ashish_patel111@yahoo.com

2017


How many Zones can be in Conventional type fire alarm system & how can we detect the fire in Conv. type FAS?

1830


1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to reconfirm its base capacity.

1999


How do you compute voltage drop and cable size over distance?

2276


we have an energy meter in a capacitor bank panel, So should we consider it's readings as energy consumption on daily basis. (when capacitor bank doesn't have any energy losses)

2441


what is the maximim current drawn by 1 phase and three phase welding machine

1872


What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

1465


difference between servo motor and synchronous motor

2334


Sir pl provide 5 year sample paper for post junior engineer(electrical).I have currently applied for junior engineer (electrical) on RRB Ajmer

3642


Difference between rating factor of cable and derating factor of cable?

1645


ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????

1035


What is zero of the system?

1105


How to calculate cable size by using load.?? Any formula...

1391