Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?

Answer Posted / mohammad naseem

There are two types of site civil engineer , first job is a
supervisory one if he works with the consultant, in this
case he needs to make sure that the document in hand is the
correct designed and issued for construction , then he will
supervise the construction contractor to make sure that
work is being carried out as designed and in accordance to
standards.
The second type , is the execution part where he works with
the construction contractor, in this case he has more
responsibilities, where he has to adhere to the design
document, quality of work, the schedule, safety of the
people, costs and more over to satisfy the consultant at a
personal level

Is This Answer Correct ?    21 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Describe the sections included in a typical bill of quantities

2278


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2996


what isload waring calculation

2384


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

2294


For what purpose bedding is used under storm water drains?

1113


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1890


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1952


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

2415


what"s the sort of beams?

2319


which formula used for calculate the area of segmental arch?

2824


what is moment-curvature relationship in semi rigid connections??

2133


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2138


How to testing voids of filled aggregate in bitumen mix design

1921


what is the price of a cubic meter of concrete on international market?

1221


how to find quantity of concrete in PCC M15

2139