Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?

Answer Posted / mohammad naseem

There are two types of site civil engineer , first job is a
supervisory one if he works with the consultant, in this
case he needs to make sure that the document in hand is the
correct designed and issued for construction , then he will
supervise the construction contractor to make sure that
work is being carried out as designed and in accordance to
standards.
The second type , is the execution part where he works with
the construction contractor, in this case he has more
responsibilities, where he has to adhere to the design
document, quality of work, the schedule, safety of the
people, costs and more over to satisfy the consultant at a
personal level

Is This Answer Correct ?    21 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

2143


The foundations are placed below ground level, to increase?

1303


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

11686


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3521


why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?

3084


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3100


1:4:8 pcc calculation 591 cu.ft

2353


length where bent up is made in slab of bridge from one end

1984


What is the zero value in quantity surveying

2594


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

1232


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2589


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3880


how many digree of freedom in four bar chain

2448


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

4235


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1777