how to measure earth pit resistance
Answer Posted / karthik.j
The earth pit resistance is measured by Megger meter. This
measurement will be done on every two months once in the site.
| Is This Answer Correct ? | 59 Yes | 60 No |
Post New Answer View All Answers
can we conduct the swineburne's test on a dc series motor? why?
bus bar design conditions and sizing pls tell me quickly
HAI SENT HPCL APTITUDE QUESTION PAPER, MY EMAIL ID IS angus_eee04@rediffmail.com,angus_eee04@yahoo.com
Is a contactor (or master relay) required between incoming lines and a VFD? The question goes to safety. If a contactor were used before the VFD and an e-stop engaged then the motor will coast to a stop (i.e. VFD loses power) instead of stopping much faster if the VFD braking fucntion were used. It would make more sense to keep power on the VFD.
what happens if earth of 33kv cable is not connected to earthing pits? please send this query's answer to ngrm.sudha249@gmail.com
A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.
is there any phase difference occurs while primary and secondary side mutual induction occurs?
any one can explain the stages of a knee point which is taken during ct magnetising curve.
what is the voltages using in movie theaters??? why ??why not other??
State angle criterion.
From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer
How u can give the overload setting to any motor protection relay for a HT motors with formula and Example?
Hi,iam a diploma in electrical engineering.rtd from indian air force in apr 2007.prsently working in reliance next link as a network maintenance engineer since 2007,can i get a job in motherson sumi.
why should small green grass ans small plant should not be there inside the transformer Yard in the factories
What is phase cross over frequency?