Answer Posted / amit singh
surveying means all kind of first activity
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What does civil engineering mean?
how can i calculate cement in brickwork
on what basis the partial factor of safety are decided? form the load combinations
Write short note on construction programme for pile foundation.
What is the difference between one-way slab and two-way slab?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
types of piles detail,
How much quantity water should be placed in one cubic meter area?
What is specific gravity???
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
what is the difference b/w full length and cutting length?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
sir, whitch is the best book (writer name) for prepration of gate....