Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is ment by surveying?

Answer Posted / amit singh

surveying means all kind of first activity

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Rate analysis of 150mm, 100mm, & 230mm thk BBM work

8466


WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?

2046


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1882


what motivates you to do a good job

3201


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

11615


What is the Roll of Water Bonding under VDF road?

2669


Explain moment of inertia?

1113


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

2175


what is that one cub metre plaster in cemant and fine sand

2055


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1930


Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

2649


what is grade intersection?

2074


How many bricks are there in 100cft?

1261


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

2031


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2144