Answer Posted / amit singh
surveying means all kind of first activity
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
what motivates you to do a good job
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
What is the Roll of Water Bonding under VDF road?
Explain moment of inertia?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is that one cub metre plaster in cemant and fine sand
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
what is grade intersection?
How many bricks are there in 100cft?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.