why we are doing post tensioning in beams and slabs.
it is economical compare to rcc? how?
Answer Posted / sunil1505
ECONOMICAL BUT ITS RISKY FACTOR...ACTUALLE THEY R RECOMONDED
ONLY TRAFFIC AREAS BECAUSE IF TENSIONING GETS..WE GET LOT OF
AREA.THERE IS NO REQ TO BULIT EXTRA SUPPORTS TO THE STUCTURE
AND IT HAS THE MORE SAFE LOAD CAPASITY THAN R C C
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is flexible and rigid footing?
Explain what is alternate bid?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
How to increase a bearing capacity of soil?
How to check slab shuttering level.? Or check list for slab ?
how to caliculate required amount of cement and sand required for 1cu.m.
difference between fc and fc'?
Why nautical mile is different from statute mile?
For what purpose bedding is used under storm water drains?
What is the difference between 53 grade and 43 grade cement
How can you distinguish between sorption, absorption and adsorption?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft