if rise and tread of stairs rae 16 & 25cm with landing slab
of thickness 100mm . If there are 8steps, and carpenter ask
for to mark the bottom of centering of landing on column,
what will be the height above floor finished level?

Answer Posted / sunil1505

there is no need to deduct 100,,ans is 1440, slab include in
raise.if not include the last raise become 260.so ans is 1440

Is This Answer Correct ?    4 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many types of survey and what are levelling instrument?

1563


how will remove spiderweb cracking in plaster ? what the reasone of make it ?

1525


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3265


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1673


though u r a civil engineer, y r u interested in tcs???

2178






Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

697


What is Rankine Cycle?

669


Process of pcc in wateredug

1805


Did any of the egyptian pyramids ever fall down?

740


What is the diff between cad & cadd?

657


What black man invented the clothes dryer?

691


how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.

10594


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1952


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

1769


how many material required for brickbat water proofing of toilets.

1603