Answer Posted / bob
1,000,000M
| Is This Answer Correct ? | 1 Yes | 18 No |
Post New Answer View All Answers
(Project Management Topic) What are the important criteria in the successful realization of the project?
how many spacers we need for 1 ton reinforcement? aprox.
How to decide/consider the grade of bitumen for dbm.
how can calculate cutting length of diamond ring
what is castigliano theaorem
Difference between pre-tensioning and post-tensioning.
how to control PQI (Project Quality Index)
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Explain why concrete barriers have curved surface profiles?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is construction mitigation management?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11