If the program buffer Hit Ration is <98%, then what should
be done by the Basis consultant?

Answer Posted / rajesh chowdary pendyala

we can increase or decrease the buffer size based on the
below analysis.
1) buffer space or directories are not optimally defined
(more buffer swaps in st02 marked in red color)
2)new module is implemented by client so as per that we need
to change the buffer parameters.
3) mass transports to the production wich dis-locates the
objects from buffers.

4)when the instance is holding the load dus to fail over in llb.

if log on load balance is configured we need to synchronize
the buffers of the instances witch belong to same group.
for that we need to set the following parameters.
rdisp/buffer mod=send-on exe-on
rdisp/buffertime=60 sec

based on the above analysis and we can see the current
buffer parameters in st02----->shift+f5 and we can change
the parameters accordingly.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is JVM switch. Why JVM switch is required ?

2346


can u explain step by step procedure of DB REFRESH..Ravi

3475


Why we execute SGEN, which Tables it modifies,will it cause DB growth? is it possible to execute SGEN later on after Golive?

2920


Explain what is the use of reference and service user in sap?

786


In my portal ABAP + JAVA I get a bootstrap error message how do I resolve this erroe

4660


What are the different options available for scheduling a background job? What start conditions type can be used?

840


i am arun, as of now i am working in a power plant. I did B.E mech and have completed PGDC in thermal power plant engineering from NPTI(NATIONAL POWER TRAINING INSTITUTE). I started my career in software oly , as i dono any software languages i got failed in conformation exam. Pls help me , i want to enter software field. in this powerplant field 6 working days for week and holiday is also not sunday, i am not able 2 tc of my family... pls help me how to enter sf fielf. my frds sujjested me 2 try as functional after 2 years. wats the procedure for that... pls pls help me in this issue I have 1 year exp in power plant, i knew mechanical design software. my id : arun0029@gmail.com

1894


How will u send mail after completion of backup?

1916


how to do system refresh?not the client copy but the-standard-system-refresh.

1856


How to define logon groups?

799


What is the difference between Party & Service without party in XI (ID)?

2081


For ex: i scheduled one ABAP program as a background job but it was running 10 days, how to analyze the problem?

1640


Hi, Cansomeone please send the system refresh doc , it's very urgent for me. Thanks in advance.

2125


Can you change the profile parameter in the os level? Which one is advisable why?

1012


How to make security authorization reports?

1874