Answer Posted / ujjval solanki
You are right ,In civil engg view- we can add-it a process
of collection of data of geographic information.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
how do we design mix ratio?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
What is the difference between engineering stress and true stress?
Can we use the flyash bricks in brick bat coba?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
what is labour consume factor in residential projects
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
for pretensioning which will yield first and same for post tensioning?
how we calculate the grade of the Bituminous materials.?????
What black man invented the clothes dryer?
how to calculate the size of triangular ring in rcc column?
What is the difference between yeild strength and compressive strength of steel???
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.