What is mean concrete class c35/20. Here C35 and 20 means?
Answer Posted / ujjval solanki
20 means 20 mPa and 30 not clear but may be temperature at
which concrete should carried out
| Is This Answer Correct ? | 8 Yes | 99 No |
Post New Answer View All Answers
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
how to calculate the length diamond shaped striupps in column
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
how to nfind out the specific gravity of sand.aggregate,water please help...
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Why the finite element method is lower bound solution?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
difference between trapezoidal and pedestal footing and how the load acts on that
what is the water cement ratio for plastering
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.