As per thumb rule cement required per 1 cum of M20 concrete
is 411Kg/cum(1.57/5.5=0.285cum of cement i.e
0.285*1440=411Kg).But as per PWD rate analysis cement
required is 347Kg/cum.the difference is 64Kg.This kind of
difference is coming every grade of concrete.Can you give
perfect suggestion regarding this.
Answer Posted / karan sardana
this is because you are using design mix instaed of nominal.. the qty of cement in 1 cum of concrete is 411kg, but in design mix the cement consumption is considerably reduced, thats why you are getting this difference always.....
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
what is detail procedure of eccentric footing? plz. give solved exmple?
what is Brick crushing strength(PSI)?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
how to convert sand in Cft to Kgs
What is unit weight of normal concrete?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
Explain major differences between routing maintenance and major maintenance.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Questions related to civil.engg in company
What is Architect-Prepared Contract?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What out turn civil works