why we use stones or rock pieces in transformer area?
Answer Posted / pratik
The main reason is that of stepping potential. In the transformer area stepping potential should not be more than a certain value. We know the fact clearly that we cannot walk fast over stones, our steps do become slow, and with this our stepping potential becomes less which is required for our safety.
Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
XYZ
HOW WE CALCULATE CURRENT IF THERE ARE NOT PRESENT ANY AMMETER OR MULTIMMETER??????
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
importance of reactive power management
Explain what is electric traction?
When the relative speed between the magnetic fields of stator and rotor does is zero under steady state operation?
Define reserve-generating capacity?
what is the effect of connecting three phase supply lines to three phase auto transformer output terminals through a fuse of 10Amp and a circuit breaker (MCB). Is this connection permanently destroy the transformer?
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?
I want to make street light with solar system ... What may I do for procedure and how much of estimation for each material ... If any one knows guide me and inform this id : aravindd7@gmail.com
What do you mean by screen of power cables?
what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering
How to set a Zone 1 distance relay for distribution feeder?
how to select energy meter? have any calculation?