Answer Posted / ahmed
Deshuttering for RCC Slab
7 Days
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
how much one carpenter can doing shuttering of slab in one day
What is an ortho mode?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
How do you calculate the power of a centrifugal pump?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What is the origin of name railway sleepers?
Why are the bolts that hold steel rails together in oval holes?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What out turn civil works
how much cement sand n bricks required in im3?and how much in plaster?
What does a construction cost covers and what does not?