what is meant by expansion joints in concrete structures?
Answer Posted / ashish sati
An expansion joint or movement joint is an assembly
designed to safely absorb the heat-induced expansion and
contraction of various construction materials, to absorb
vibration, to hold certain parts together, or to allow
movement due to ground settlement or earthquakes. They are
commonly found between sections of sidewalks, bridges,
railway tracks, piping systems, ships, and other structures.
Throughout the year, building faces, concrete slabs, and
pipelines will expand and contract due to the warming and
cooling through seasonal variation, or due to other heat
sources. Before expansion joint gaps were built into these
structures, they would crack under the stress induced.
The expansion joint can be as simple as a caulked
separation between two sections of the same materials. More
recently, expansion joints have been included in the design
of, or added to existing, brick exterior veneer walls for
similar purposes. In concrete and concrete block ("CMU")
construction, the term applied is control joint, but serves
a similar purpose.
Is This Answer Correct ? | 24 Yes | 2 No |
Post New Answer View All Answers
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
what is the coefficient for running feet to cft coversion both area and price
HOw much % of premium on DSR-2013 currently
how gradation of aggregates effect on slump of fresh concrete?
What is meant by dimensioning?
how can we calculate steel value, depending on load
How to determine spacing of bars in slabs or beams
Spider cracks occur in beam bottom due to––
What is difference between engineering stress and true stress?
What is rate of concrete surface rendering work per sqm
is basic cost of the material includes tax?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Define absolute co-ordinates?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour