do the following test for checking the cement
1. fitness test - not more than 10% passing in 90 micron seive
2. consistency test
3. initial setting time nd final setting time
4. mortar cube test 3days 7 days 28 days
Is This Answer Correct ? | 15 Yes | 3 No |
Post New Answer View All Answers
Which is the latest version of solidsworks?
what discoveries did you have in relation to your course?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
what is the theoritical percentage of concrete cubes testing per day?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
how many tonnes equals to one cubic feet?
How to plan a project
What is the coeffiencent Friction Angle between Steel and Ashphalt?
how many litres of enamel paint required for 5000 sft of site??
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
What are the uses of layer?
For what purpose bedding is used under storm water drains, explain?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is the difference between chamfer and fillet?
In a concrete grade C35A, C & A stands for what and equalent cube strength?