Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?

Answer Posted / ajay kumar pal.(j.e)

for finding the total value of

take 1.52/(1+2+4)

=.22
hence total qty of cement .22*1= .22cum
cement= .22/.0354 = 6.2 bags of cement
sand = .22*2 = .44cum

Aggr =.22*4 =.88cum

ANS.

Is This Answer Correct ?    17 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Any strength is a stress but any stress is not strength

1738


roll of DLC in road constructions

1837


psc girder detail

3107


How to calculate chejja reinforcement

2457


In block work seawalls what is the purpose of slip joints?

1180


what isload waring calculation

2317


What is 1/8 on the architect ruler denotes?

1087


what is E VALUE FOR WOOD

1999


What is an object snap mode?

1134


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1594


what will happen if one could not properly follow the spacing of slab reinforcement bar?

1995


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2305


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

2052


how i get all type of short type question answer about civil engg

1654


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2074