What is the proportion of cement agg. and sand for M20,M25
and M30?
Answer Posted / aditya richie
concrete is designed by Job Mix Formulae, not just by
taking some standard values
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
How you can turn off the display for dimension in CAD?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
Define What is the distance between railway tracks?
All aptitude question of Bechtel
How much material will consume for following specification water tank (9*7.5*6 feet)?
How can i do RCC rate analysis?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
Mention different types of roof systems?
What is the density of most of construction materials?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what is diffrence between catchment area,watershed and basin?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
How many square meter can mason layout chb per hour