Answer Posted / abhi
15KG/M^3
| Is This Answer Correct ? | 3 Yes | 6 No |
Post New Answer View All Answers
what are the five benefits of using standard terminology in the measurement process?
may i know the detailed description of cutting length
how to caliculate required amount of cement and sand required for 1cu.m.
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is the quantity of cement in mix m20 concrete?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
1m square 20mm plastering how much of water need curing work
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What goals do you have in your career?
Explain what are the phases inspections are done by local authority while construction?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure