Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to defind P.C.C. mix design according ratio & IS coad

Answer Posted / srikanta sahoo

pcc is placed for levelling and to protect rcc from direct
to earth

Is This Answer Correct ?    32 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

1098


punj loyed and sapurjl palanjl

2362


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

2058


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1921


does a b.tech civil engineer fresher supposed to know how to design rcc structure?

3449


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

2099


in the construction of residential building what type of tank are used?where?why & what is its purpose?

2378


Test procedure of fly ash bricks as per code ?

2584


to draw bm diagrams for portal frames under different loadings//

2975


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2222


What is missing report and how to prepare

1567


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2952


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

2026


what is c4x light weight cement blocks

5656


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

3313