Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Which is default or standard size of tiles used in dado
bathroom

Answer Posted / tapas roy

I think there have no standerd size of dado in bathroom ,it
is only depend upon the size and ht. of bathroom whichever
water can eassely remove the wall.....
Generaly ,we are use dado size is 1.5m ht X sorrounding
bathroom length ,except door oppening......."Tapas Roy"

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many BSCs can i connect to the HUAWEI MSC

2307


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

2756


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2857


to draw bm diagrams for portal frames under different loadings//

2983


use ofr concrete as per grade ?

2087


why we create short columns under grade slab?

2316


which red: used in roof teping, then use only cement

2017


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

2236


What do you meant by gui?

1235


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

2239


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

4498


States some of the tool bars used in cad?

1206


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2089


How to calculate 1 brss for RCC work  

2189


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

2225