What is meant by operating sequence of VCB : 0–0.3sec.–CO–
3min.-CO
Answer Posted / srinivasan.
open-300 millisec-Close /open-3min-Closeopen - means the
circuit breaker is capable of performing the above
operations even at full shorcuit currents.
At the same time the circuit breaker should not be allowed
to operate lesser than these timings.For example open-20
millisec-Close open-1 min-close/open.
This type of breakers are called single shot autoreclose
breakers.
Immediately after a fault breaking,we can do close open the
circuit breaker.
This sequence is tested during type testing only.
| Is This Answer Correct ? | 16 Yes | 3 No |
Post New Answer View All Answers
what is maxemo work permit procedure
what are the 4 rules to start the motor?
How to calculate the Harmonics losses in terms of cost/unit.
What is Traction? 1KVA Alternator, How much urrent taken?
If I want to replace a 26KW Slip ring Motor with a Squirrel Cage motor & Drive (for a Hoist Application). How can I approximate the Motor & Drive HP required in new Setup.
2- What are the percentages between excitation currents in phase (R, S and T) in ∆ and Ỵ connections in excitation Current test in transformers?
What is power relay?
features of hbc fuses
Testing report of Earthing of 3.15 MVa PTR.
how can i determine the gear ratio for a rack and pinion system if an electronic gate operated by an electric motor is to travel a distance of 5meters in 15 seconds.
what is the effect of change in supply frequency on load angle of synchronous motor,all other parameters remaining same?
Under wat condition statcom operates as an inductor for the transmission line?
draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words
What is the diff. between single compression and double compression gland
determine two methods to find loose connection in operational electrical system?