How does one detrmine the direction of movement of core in
an LVDT?
Answer Posted / guest
LVDT has an ac excitation. the outputs of secondaries are
added in opposition, and indictaes the deviation in
position of the core from the null position. For detrmining
direction of movement, the excitation voltage of primary is
used as reference, and the phase of the (summed) secondary
is identifed using a phase sensitive detector. This is a
synchronous switch operated with primary excitation, and
rectfies the secondary output is such a way as to produce
positive voltages in one direction (of movement of core)
and negative voltage in the other direction.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
what is use of communication wire in multipare cable(oil and gas field), why this communication wire not used in single pair cable?
all types instrumentation questions want
typical loop drawing of a simple feedback control comprising of one transmitter and one control
can anyone guide me how to get any of the previous year GAIL question papers? are they available? 0n 2nd august i have to take the written test.
What is the procedure of calibration of Load cell?
How we connect a instrument with ground, Give brief explanation with help of diagram?
Can Any body tell me about the Contact or Email id of any good Consultancy which help me to find a job in Instrumentation Field in India .I have Six years of Work Experience in the Same field.Please revert me back on shammi_gwalior@yahoo.com ?
List three types Level Switches with their working principles
How r the calculation of process line mpm.
basic connection and principle of axial shift sensor n differential sensors in tubine describes n draw......
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.
Explain PID, ON/OFF, Controls
how to calculate orifice sizing? and tell me if pipe size bet 50mm t0 200mm then we can use pipe flange??? and above 250mm pipe size should i use D & D/2 Flange? is it right or wrong?
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
how to turbine speed measurement?