Which are the master data relevant for PP module?

Answer Posted / govind mandhare

SAP PP Master data consists of below given configuration.

1 Material Master
2 Bill of Material
3 Routing
4 Workcenter
5 MMSC

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In project the customization is comes under which phase?

705


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

753


Explain the mrp list and their uses.

746


What is golive actually? What is the role of a functional consultant in golive actually?

699


What is the use of mrp pp evaluations?

792






Have you used Pull list or back flushing in REM?

1753


We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?

715


Explain how the pp module is organized in sap?

715


How to attach a drawing for a material to bom ? Is it possible ?

739


Explain In-process inspection.

1132


What is Production scheduling Profile and use of it?

1453


• How are basic order dates determined?

1899


How can I use variable size items?

776


any one can provide me some sample resume for SAP PP with 0 to 1 year experience?

3682


Explain what is the meaning of exploding a bom?

750