Which are the master data relevant for PP module?
Answer Posted / govind mandhare
SAP PP Master data consists of below given configuration.
1 Material Master
2 Bill of Material
3 Routing
4 Workcenter
5 MMSC
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
In project the customization is comes under which phase?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
Explain the mrp list and their uses.
What is golive actually? What is the role of a functional consultant in golive actually?
What is the use of mrp pp evaluations?
Have you used Pull list or back flushing in REM?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
Explain how the pp module is organized in sap?
How to attach a drawing for a material to bom ? Is it possible ?
Explain In-process inspection.
What is Production scheduling Profile and use of it?
• How are basic order dates determined?
How can I use variable size items?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
Explain what is the meaning of exploding a bom?