Answer Posted / sharif solanki
M10=1:3:6
M15=1:2:4
M20=1:1.5:3
M25=1:1:2
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
what is the mix design for M:60 with micro silica andmetakaoline?
Which type of plywood & sizes using in construction projects ?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
why we use aggregate,sand with cement in concrete?
How much is the cover for slab?
(Project Management Topic) What are the important criteria in the successful realization of the project?
What do you mean by honeycomb in concrete?
Explain how you can turn off the display for dimension in CAD?
What is difference between code and standard and specification?
how to calculate load bearing column
how to check and keep control on the wastage of material at site
how to tie 10 legged stirrups
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
difference between trapezoidal and pedestal footing and how the load acts on that