Answer Posted / rosh
If we can use Inlr - File are closed status after ending
the program.
Return - files are in open status after coming out from the
program
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to select highest score of each subject or how to select highest income of every month?
explain sflclr, sflend, sfldlt, and sflcsrrrn?
What is ment by record level identifier?
what is *place and *auto keyword in prtf ?plz explain
how do I preserve and clean the array?
during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.
what is a rpg?
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?
are there any useful c runtime apis that I can call from rpg iv?
do you use message subfiles? What are the necessary keywords required coding a message subfile?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Set on command is used for closed all opened files , initialize var and release resource , return cmd is used for return to calling program but my req. Is dnt close opened files and resource must released while doing transactions , how can i do this...?
can anybody help me to solve this problem. the program that i m checking display error message saying "Record format for file AJDSPFFD does not match model file and decimal error. how to solve this problem. The AJDSPFFD is snapshot the AJTLOG that is the audit trail list.
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?