Outline ten different ways in which typical bill of quantities
can be used?
Answer Posted / shanthi mary
1. For tender
2. Work order
3. Budget preparation
4. Scheduling the activities with BOQ
5. Planning for materials
5. Planning for Labours
6. Planning for Money and machineries
7. Sub-Contractor billing (executed quantities against BOQ)
8. Client billing (executed quantities against BOQ)
9. Material reconcilation
10. To highlight the slipages in each activity in BOQ
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
what is the type of earthing
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
how can we construct building without foundation providing only grade beam at ground level
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
What is the meaning of a blue land surveyors flag?
How to increase a bearing capacity of soil?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
where can i get the previous question papers for rrb section enginerr (civil)
significance of specific surface area of particles?
why are you joining in this (applied post) job and your aim for this job
Differentiate orthographic and isometric projections?
What is the substitute of Mastic Asphalt?