Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the 45 degree bent up length. if we given
that whether the total length of the slab reinforcement will
increase or not. mantion it clearly please. this is for bar
bending schedule purpose?

Answer Posted / liton1_06

L+.42*d

Is This Answer Correct ?    3 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2505


In reclamation works what are the importance of geotextiles and sand?

1095


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2097


What is quantity of cement and sand required for 2000sqft of tiling?

2793


what is the types of door's wood?

2030


For making a new road in a village having a school & hospital , tell the steps of construction systemically ?

1599


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

2014


What do you mean by bond? What are the different types of bonds?

2180


Test procedure of fly ash bricks as per code ?

2543


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

2083


Why are separation membranes used between concrete pavement slab and sub-base?

1307


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

2002


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

1990


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

2057


How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density

1984