Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is defenation the rolling margine ? .. what is % for
steel & what its effects if it is + or - ?

Answer Posted / suresh

Rolling margin is the difference between the actual and
theoritical weight of steel sections. It may be up to 1%. +
means overweight and - means under weight

Is This Answer Correct ?    17 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the cost difference between site mix and ready mix concrete per cubic meter

1876


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3665


What is meaning of FREE STANDING STAIRCASE ?

3021


The foundations are placed below ground level, to increase?

1249


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

2357


What are the composition of a landfill?

1235


How can i display 5 asterisk and another 5 asterisk )?

2504


what is mean by reestimation?

1806


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

2063


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2089


What is a hatch patterns?

1095


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

1791


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

2391


what is project?

2374


yasser arfatcompleted his degree in civil from which university

2253