Answer Posted / m. velmohan
2400-2500kg/m3
| Is This Answer Correct ? | 27 Yes | 3 No |
Post New Answer View All Answers
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
What is the tensile strength of marble?
What is costing in 100squre feet bricks
construction workers how much time take one work or qty
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Why joints are provided?
WHAT IS YOUR CURRENT SALARY
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What are the applications of modulus of elasticity?
What are the alternate material for steel, Sand and aggregate
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
what is right & short method of measurement of slab&beam