Which IS Codes used for the steel reinforcement work?
Post New Answer View All Answers
how to absorb to site basic corrections? which are the important correction?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
what is thumb rule for calculating the size of ISMB required for a particular length of span
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What is demising walls?
Define What is rigging?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
How do we test on design and style in a software?
punj loyed and sapurjl palanjl
what is the minimum cement content for M20 & M25 as per is code -456(2000).
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
door and window wood work calculations and different methods
How we calculate the service time of buildings
What are the advantages of building a dam on the river nile?