Answer Posted / joker
NGR means New Girl Required. It means when you are tired of
your wife, it's time to find a new one! Haha..
| Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
difference between crane drive and line drive.
how to calculate IR value of 33KV cable ??
why Lightening Arrester Probe sharp at Top of telecom tower.
why we are using Load factor?
what is the difference between STAR and DELTA connection and application wise how it can be utilizedd
Define cuttoff frequency?
what is diff btw electric,magnetic & eletromagnetic field
Why single phase induction motors are not self starting ?
how is control wiring coding is done in a CRP panel ?
how can i change the rotation of the AC single phase induction motor and show me by diagram
. How to calculate the Short Circuit Impedance in Transformer? How to calculate the Short Circuit Impedance in Transformer?
in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?
what are the sample questions asking to the test cunducting for electrical superwising lisence test?
what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?
How two nos. 130 kw D.C motor get synchronise using D.C drive.