Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between factor of safety and partial safety factor.??

Answer Posted / agilan

The factor of safety for loads is known as partial safety factor.

Partial safety factor=Design load/Characteristicload

Is This Answer Correct ?    21 Yes 29 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how calculate the bearing from two coordinates?

2253


what is Brick crushing strength(PSI)?

1273


Form where IS456 is adopted in 1978?

1981


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2077


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

2259


it is possiblee to produce concrete with out cracks...

1896


what could be the production cost of 1 cum of concrete by CP30 plant

1699


what is the meaning of degreasing of the euipment or line.

4051


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

6238


Define Workability ?

1245


How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/

1860


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2851


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1952


What out turn civil works

6804


What are the responsibilities of a site manager?

1124