how to calculate the 45 degree bent up length. if we given
that whether the total length of the slab reinforcement will
increase or not. mantion it clearly please. this is for bar
bending schedule purpose?
Answer Posted / satyanarayana
0.42 d where d is the depth of slab minus bottom and top
covers
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
How many feet are in 4 square yards?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What Are The Steps Involved In The Concreting Process, Explain?
how to remove the quantity of metal 1 and metal 2 in concrete
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
How can you distinguish between sorption, absorption and adsorption?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
How many days should curing of plastering, brick work and concrete
what are the layers of the national and heir aprox thickness??
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How is make concrete cube?
What are the different types of runners?
What is thumb rule in quantity and cost estimation of a residential building?