Answer Posted / habeebur rahman
The specific gravity of a material is the ratio of its
density to the density of water(1*10^3kg/m3).This ratio is a
pure number containing no units.by using pycnometer test we
can calculate the specific gravity.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How much cement and sand required for 9"brick wall per square metre
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
cause of cylinder test failure
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
What you understand by building codes?
how to absorb to site basic corrections? which are the important correction?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
please send me bhel questions on rupesh.017@rediffmail.com
what is the use of beam end forces while using a staad ? wha they are show
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Define What is a kip?
1m square 20mm plastering how much of water need curing work
What is pre-stressed concrete?