Answer Posted / farzana kalluri
Runtime Column Propagation.
Propogating the data from input to output automatically
without mapping manually.
RCP is 3 types.
1)Admin level RCP
2)Project level RCP
3)stage level RCP
If we enable the RCP it will directly map the columns at
any level..
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
Difference between IBM DATA STAGE8.5 and DATA STAGE9.1 ?
Describe stream connector?
What are iconv and oconv?
hi iam new to this tooliam cmpltied to know abt datastage so now iam in project tell me whole step by step what iam doing iwnt to go with exp so plz hlp me pals
what is ds administrator used for?
What are the important features of datastage?
What are the components of ascential data stage?
Does datastage support slowly changing dimensions ?
Differentiate between Join, Merge and Lookup stage?
Define project in datastage?
What is the difference between informatica and datastage?
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
How will you move hashed file from one location to another location?
how to write server Routine coding?