Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is LOTO?

Answer Posted / tushar patel

this is tushar patel from ultratech cement ltd.

loto is basically due pont standard for electrical safety.


thanks & regards;
tushar patel
ultratech cement ltd.
cell:9904809055

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What's mean HVF & HAF in Vacuum Circuit Breaker?

5360


When is lag lead compensator is required?

1129


How does a battary stores charge in it? please explain in simple manner and in detail.thanks

1989


What is the numerical quantity of sqcm?

2035


is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.

1717


What if high voltage side circuit breaker of a ehv transformer instead of lvcb? Kindly elaborate.

1757


how withstand of hi-pot test outputs of transformer wire 2.5mm

1978


what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?

2177


How does an induction motor start?

1228


why the making current is more than then the breaking current and if its true then its about a controling circuit or breaker power contact points

2081


Define pole pitch?

1104


What is the main purpose of c.f.b.c.boiler

1724


What is float cum boost charging system?

2064


some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?

1774


Can anyone please give me the parameters , formula needed to calculate the circuit breakers for building services.Thanks

2147