How we calculate the actual diameter of the TMT Steel

Answer Posted / kameshwar mahto (saroj)

Take 1m ling TMT Bar weight it.

weitht = d*d/162 (We have weight, find the diameter)

then calculate radius = radius = diameter/2

Is This Answer Correct ?    58 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1816


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

659


Formula of mid span bar

1468


Define What is the tallest man made structure in the world?

658


Spider cracks occur in beam bottom due to––

1655






I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

2320


How to calculate the force on a column of three story building. What should be the base concrete height?.

1655


Differentiate orthographic and isometric projections?

652


Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)

2010


where can i get the previous question papers for rrb section enginerr (civil)

1872


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1738


What is meant by scaffolding coefficient?

2192


What is hybrid foundation?

687


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1505


Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.

1829