IN A DY11 GROUP DISTRIBUTION TRANSFORMER WITH NEUTRAL
EARTHED, WHAT WILL HAPPEN TO THE SYSTEM VOLTAGE & THE
EQUIPMENTS IF EARTH GETS OPEN ON LOAD?
Answer Posted / murtaza
three phase supply will not affect so three phase
appliances willn not affect for running but single phase
appilances will not because these appliances are not
getting proper voltage or required voltage
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what are carbondioxide and dcp used in fire extinguishers
Why a Permanent Magnet Generator has higher frequency as compared to frequency of main alternator?
hi this is hema can anyone mail me previous years questions for the APPSC-A.E.E (in electrical stream.) ......thank u.
how can we select the appropriate VCB ?
why do we need to use 3c+3e cable, normally i select only 3c+e cable and i think it is enough. pls explain the usefull of 3e cable ( in this project the earthing system is well done)
Explain the different regions in frequency response?
what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group
According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor
What is Long rod insulator and it's applications..? merits over the disc insulator ..?
Explain the purpose of inductor in an electric circuit?
At the starting of dc motor and syn.motor and induction motor high current flowing through the winding. Due to this the windings burnt out. To avoid this different types of starters are used. But incase of transformer what Will be used (At starting no emf is induced in the primary winding)?
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
what are the disadvantages in GIS over AIS
different aspects of voltage stability
hi frnds what is meant by harmonics & what is meant by third hormonics,where its will occur ?thank u