WHAT HAPPEN WHEN CT SECONDARY OPEN DURING LOAD
Answer Posted / yogesh
Mr.Ravi want to say step up means voltage step up and
current step down
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the difference between active power and reactive power and apparant power in practical as well as theoritical
what is the best method of grounding in 30 MW generator?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
what is per unit calculation?looking for simple and strong explanation thk u
What is big transformer parts and their function ? Ty
1.What is the range of stator resistance of 3-phase induction motor? 2.Two electrically operated vibro motors are foxed in parallel direction in vibrating feeders. what is the direction of both vibro motors?
why do we need to use 3c+3e cable, normally i select only 3c+e cable and i think it is enough. pls explain the usefull of 3e cable ( in this project the earthing system is well done)
What is bridge rectifier and explain with details
Write masons gain formula.
What is the high series capacitance winding on high voltage power transformer ?
hr round
how can we change the phase angle b/w two phase?
what is the role and fuction of automatic transfer switch in rotary ups
what is effect of leading power facter on the system and billing
How to calculate the multiplying factor for energy meter with ct ratio given