WHAT HAPPEN WHEN CT SECONDARY OPEN DURING LOAD
Answer Posted / yogesh
Mr.Ravi want to say step up means voltage step up and
current step down
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the maximum breakdown voltage of 11KVA and 66 KVA power line and how it is calculated?
what type of motor used to move a 1 ton gate? and relate ratings with load.
why capacitance effect is predominant in underground cable transmission and inductance effect is predominant in over head line transmission?
Difference between rating factor of cable and derating factor of cable?
How can a equal potential zone be carried out in conductors?
What is the exact formula for one weber of magnetic flux?
what are the application of over current relay?
briefly explain the main blocks found in a microprocessor based system
Why do we pefer VCB over OCB?What are the advantages of VCB over OCB?
how to select fuse rating for a 3-phase motor ???
for a 400kv t/m line with 10 ampere current will corona occur?
What is the difference between PLC and Embeded system
ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????
What is mean 2XWY
Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.